…to me. I went to the post office to pick up a box.
A few pictures:
Some assembly required.
The bellows are 95% finished. Looks like I need to put on the arm strap and a valve. The bag is 95% finished. It is already sewn about the perimeter. I will be installing the the bits that lead to the chanter and the connection to the bellows.
I am crazy for wanting a set of UPs, but not THAT crazy!
Part of me wishes I had just waited to save up the extra $200 for a completed practice set…but another part of me is saying, “Slacker! Shut up and build it!”
I’ve lost track of the number of dark sides I have joined.
I will officially begin this construction project on Saturday. This week just too much fuss and mess with Christmas stuff. I have all of next week off, so if I can get my two little boys to leave me alone long enough, I could theoretically pipe in the new year. And by pipe, I mean squawk/squeal and what ever odd noises a brand new uilleann piper can summon from a set of pipes.