you only get what you pay for,it takes ten~twelve weeks to make a full set of pipes, 40hrs per week, £10 per hour,that =£400 aweek,10 weeks at £400=£4000, then materials, the maker has to charge £10 per hour min,then he has his stamp and tax deductions and over heads
Stew
This is way off base here Stew. If a pipemaker has told you this then he must be having to many tea breaks. A friend of mine last year went to a College of Further and Higher Education in Leeds. On a ten week, 2 1/2 hours per week course he managed to produce himself a set of drones for his practice set. He was also lucky that the college had bits of brass tubing that he could use at a small cost. But he had to order 2 pieces of tubing, and was amazed to find he had to order in 18’ lengths, but he did.
During this small amount of time he managed to make his D-bit drills and a pipe bender, although he admitted the lecturer gave him assistance with the tube bender. Keeping in mind this guy is a chef by trade, he produced a set of 3 drones and a hollow stock similar to what Dave Williams makes (he tried to make a wooden stock but made a mess of it, but found the Williams design very easy as he could drill it on the pedestal drill)
The drones are basic with button mounts from the timber he was turning the material ebony and brass. But all said and done, this set of drones played as good as anyone else’s drones and looked well also. He also told me the only real difficult part was getting the work centered after removing from the lathe and placing it back on again.
David also made several keys for regulators with some advice from the lecture and claimed he took an hour to make one. He was told to use brass 5 – 12mm (not sure that the measurements are correct but they are something like that) and cut and file into shape using hand tools.
If he could do this type of thing in the time he did it, I’m sure pipemakers will have no problem turning out a set of pipes in less time and with a lot more ease.
Allan Ginsberg can crank out a set within a week from what I’ve been told, although I wouldn’t want a set from him. His stuff is good and bad depending on what set you come across. The fact is there is no way in the world should a pipemaker need 3 months solid to turn out a set of pipes and I don’t think any pipemaker would even suggest that either. It may take 3-4 months for set, with a lot of that time used to rest wood after stressing it out from boring etc.
Seamus ![]()